The bad weather has had its first consequences, causing problems in several areas. It is reported that as a result of the intense rainfall, a mass of inert material has slipped and blocked the Theth-Ndërlysaj road. Stones and water have flooded the road, making it difficult for vehicles to circulate.
It is reported that the mass of stones has also blocked the water channel that supplies the Nderlysaj hydroelectric power plant.
Meanwhile, contracting firms are working to clear the road. Currently, the road is accessible on one side.